The terracing had been uncovered since 1998 and having recently gained planning permission to add a new roof, the club were keen to provide shelter from the elements and bring an enhanced atmosphere to the area for fans. Bridgewater Development told us what the club were looking for and we carried out a design that would work and be in budget. Stadium Solutions manufactured and erected the structure, spanning the length of the terrace, including cladding the steelwork in a striking blue and white striped design. The front fascia is finished in a special bullnose design which compliments the overall streamlined look. With less than three weeks to build, including bad weather which prevented the sheeting gang working for a few days, we are pleased to say we got the job done on time and without issue. It was a pleasure working with Bridgewater Development who provided top quality groundworks ready for us to start.
"As principal contractors we found working with Stadium Solutions very easy. All required technical and specification information was provided in a timely manner and any queries or concerns dealt with, and proactive solutions offered. The installation was faultless - we handed a particular area of the site over for two weeks and at the end of that period they handed back the finished stadium. All in all, a very easy company to deal with and we will certainly be returning with future projects".
Phill Rhodes, Bridgewater Development (South Lakes) Ltd.
Design of roof structure to go over existing terracing, manufacture, installation and sheeting to provide a finished roof.
Every stand we make is built to order so you can add features to maximise use and create a unique stand that most suits your needs.