This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Find out more here

Chippenham Hockey Club

Our stunning 33 seater covered stand which, although small, also boasts a disabled access area under the cantilever roof, perfectly compliments the all-new pitch surface recently finished. We were asked by our client Verde Recreo if we could design and build a stand that would fit a depth of 3.95 metres while also allowing for 30 seats and disabled access. Our 3-row option enables the club to maintain adequate access for users to the front together with a low level fence. This site has limited access and only a footpath's width to get all materials down to the slab - fully fabricated stands that have to be dropped down onto the base by crane would be no good on this job! With lightweight galvanised steel light enough to carry and our can-do attitude, it took only two days for our team to fully build the stand so both client and club are happy, and we're thrilled to see another of our high-quality stands up and ready for use by the biggest hockey club in Wiltshire!

Chippenham Hockey Club

"Good service, very pleased with the stand".

Verde Recreo Ltd (Main Contractor)

Project Scope

Lightweight 33 seated stand in 3 rows with integrated disabled area


Enquire Now

Products Provided